Tuesday, August 6, 2013

FLOODING PROBLEM aT tHE MAIN ROAD STATION 3, tO BE GIVEN a SOLUTION

Written by: Bert Dalida

A solution to the recurring flood problem at the main road station 3 will be implemented.

According to Malay Municipal Engineer, Elizer Casidsid the flood water from the mentioned area will be diverted going directly to Sitio Lugutan, Manoc-Manoc.

He added that the distance from the area going to Sitio Lugutan is quite far so the flood water needs to be pumped from the area and will fall into the drainage.

Casidsid mentioned in particular the recurrent flood problem experienced by motorists at the Main Road in front of Le-So Lei de Boracay.

Casidsid disclosed that pumping the flood water is the easiest solution.


Translated/Edited by: Rodel J. Abalus

No comments: