Friday, October 10, 2014

Operation of Petro Wind Energy Plant in Nabas and Malay prepared for 2015

Posted October 10, 2014
Written by Jay-ar M. Arante

The operation of Petro Wind Energy Plant in the town of Nabas and Malay, Aklan is now being prepared for this coming year 2015.

As required by the National Grid Corporation (NGCP), Petro Wind Energy Plant has already installed its Fiber Optic Cables.

They have also raised the 18 wind mill or turbine in Nabas and Malay, expected to add energy needed by the NGCP Visayas grid for next year.

On the other hand this also the reason why the Aklan Electric Cooperative (AKELCO) have scheduled a power interruption affecting the town of Nabas, Malay, Buruanga and the entire island of Boracay to give way to the configuration of the lines.

Aside from being a big help for the energy needs in Visayas, the Petro Wind Energy Plant is also expected to become another tourist attraction in the province similar to the famous wind farm in Bangui, Ilocos Norte, which is also a big help for their economy.

No comments: